Preliminary Procedures
These instructions cover the installation of the HumidiPack
®
and HumidiPackPlus with the Armstrong ACV
Control Valve (models listed below). The HumidiPack and HumidiPackPlus represent complete packaged
humidification systems when used in conjunction with existing boiler steam. HumidiPack may also be
used for distribution of steam generated by electric or steam-to-steam humidifiers (steam generating). In
these instances, no strainer, control valve, or steam traps are supplied. When used with boiler steam, the
systems come with the following equipment:
HumidiPack Contents:
• HumidiPack Panel
• Armstrong Inverted Bucket Steam Trap
(to be used to drip steam supply to control valve)
• Armstrong ACV Control Valve
• Armstrong In-Line Y Strainer
(to be used prior to the control valve)
• Armstrong Float & Thermostatic Steam Trap
(for condensate drainage of HumidiPack header)
(two traps are needed for HumidiPack CF)
Step 1: Check Shipment Against Packing List.
All components are listed on the packing slip. Report any shortages immediately. If the HumidiPack or
accessories have been damaged in transit, notify us and file claim with the transportation company.
If your order covers more than one
package, segregate each complete
assembly. Equipment tagging will be the
same as shown on the packing list.
Model, Serial Number, Steam Pressure
and Orifice Size are on the metal plate on
the control valve body.
Step 2: Check Local Codes.
The Armstrong HumidiPack should be
installed in accordance with all applicable
building, plumbing, and electrical codes.
Step 3: Find HumidiPack Panel Location.
Locate all HumidiPack equipment according to the engineer’s layout or as indicated by your Armstrong
Representative. If you must locate the HumidiPack/HumidiPackPlus yourself, be sure to read and observe
the “Do’s and Don'ts” to follow.
Do’s & Don’ts of Location and Installation
HumidiPackPlus Contents:
• HumidiPackPlus Panel
• Armstrong Inverted Bucket Steam Trap
(to be used to drip steam supply to control valve)
• Armstrong ACV Control Valve
• Armstrong In-Line Y Strainer
(to be used prior to the control valve)
• Two Armstrong Float & Thermostatic Steam
Traps (one for header drainage, one for active
tube jacket drainage)
All recommendations for the application of the Armstrong HumidiPack and HumidiPackPlus are based on tests
and field experience. However, they are based on duct air velocities and temperatures that are most commonly
encountered, and the recommendations may have to be modified when velocities are very high and/or
temperatures unusually low. We also reserve the right to modify recommendations without notice if
subsequent tests or experience indicate that a change should be made. For these reasons, we urge you to
check all applications with your Armstrong Representative before installation. (Illustrations applicable to both
HumidiPack and HumidiPackPlus.) See Figures 3-1 through 3-7.
Model Size Available Pneumatic Operators
ACV-2 Armstrong C-1801
ACV-3 Honeywell MP-953D
ACV-4 Honeywell MP-953F w/Pilot
ACV-6 Positioner
Model Size Available Electric Operators
ACV-2 Honeywell M9182A
ACV-3 Belimo
ACV-4 AF24SR or NVF24
ACV-6
Armstrong ACV Control Valves*
*Some larger size HumidiPacks may use 2" or 2-1/2" Honeywell
control valves.